Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jun 12, 2023     Starting work on vertical stabilizer - (2.0 hours)       Category: Tail Feathers
I decided it was time to focus on the empennage kit so that I could keep the progress happening since I want to move the wings before doing anything else with them. The first new section was to work on the vertical stabilizer, and the first step was to identify all of the pieces, remove the blue vinyl plastic, and label the parts with a marker.

I had to cleco a doubler onto the front spar, then match-drill the remaining holes, and then trim off the bottom couple inches from this front spar. Then the temporary locating-portion of the doubler could also be cut off and discarded.

The next few power-coated pieces needed to be final-drilled and match-drilled while being clecoed against another fork-shaped doubler and another piece of the rear spar. I also retrieved the vertical stab skin out of the garage and stripped its protective vinyl coating.

What's next? Dimpling and maybe priming these parts before starting to rivet them together.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.